OUR WORK
Case studies
Real projects, real constraints. A selection of work where safety, automation and instrumentation had to perform on installations that could not stop.
8 case studies
Fire and gas system renewed with zero downtime
The server and network infrastructure behind the fire and gas system on a producing offshore platform was renewed while the platform stayed in full operation.
SIL-compliant wireless gas detection for a refinery tank farm
A new fire and gas system with wireless gas detectors gives a large refinery tank farm better detection coverage, without kilometres of new cable.
A complete SIL 2 HIPS package, from sensor to valve
Two SIL 2 high integrity pressure protection systems protect downstream process equipment against overpressure, delivered as one package with one responsible supplier.
End-of-life safety nodes migrated on a gas export pipeline
The process protection and shutdown nodes that control a gas export pipeline are being moved to a current HIMA platform before spare parts run out.
One control room for three offshore wind farms
Twelve independent supplier systems across three offshore wind farms were brought together into one common control room.
Rotation and balance control for a floating wind pilot
Control software that keeps a wind turbine on a floating structure at the right angle and orientation, in all weather.
More precise level measurement for better process control
New level transmitters on a first-stage separator replaced instruments with spurious failures, giving the control room measurements it can trust.
1 184 barriers replaced on live safety systems
Ageing intrinsic safety barriers in 18 safety and control cabinets were replaced while the systems stayed in full operation.
To protect our customers, installation and customer names are not shown. We are happy to share more detail in a meeting.
Facing a similar challenge?
Tell us about your installation and what you want to achieve. We will put you in touch with the people who deliver projects like this.